Zhangjiagang  :  
Advertorial
Home> Policies

Guide of Foreign Investment in Production and Supply of Power, Gas and Water

Updated:2013-01-22

  Print Mail Large Medium  Small 0

1. Construction and operation of electricity power by employing the clean fuel technology of integral gasification combined circulation(IGCC), circulating fluidized bed over of 0.3 million KW or above, pressurized fluidized bed combustion combined cycle(PFBC)of 0.1 million KW or above

2. Construction and operation of back pressure heat power plant

3. Construction and management of hydropower station with the main purpose of power generating

4. Construction and management of nuclear power plant (Chinese partner shall hold the majority of shares)

5. Construction and management of new energy power plant (solar energy, wind energy, geothermal energy, tide energy, wave energy and biological mass energy, etc.)

6. Utilization of sea water(direct use of sea water, seawater desaltation)

7. Construction and operation of water-supply plant

8. Construction and management of regenerated water plant

9. Construction and management of charging and battery replacement station for vehicle

Copyright © China Daily All Rights Reserved Sponsored by Zhangjiagang Municipal Government Powered by China Daily    京ICP备10023870号-9